The site from orbitPort Talbot steelworksSteelworks where the blast furnaces were shut in 2024 · United Kingdom


Drag the slider to compare June 2023 with July 2026. Click a number to see what we noticed there.
This view is about 9 km across, with north at the top.
Our view of Port Talbot steelworks (Tata Steel UK)
We believe the steelmaking part of this works has been shut for more than two years, because we have not seen any furnace heat since July 2024. If the policy is still priced for working blast furnaces, it no longer matches the site.
Why we say this
The heat stopped after July 2024 and the site became much dimmer at night that November. The owner reported both furnaces closed during 2024.
In the twelve months before January 2025 we recorded 2 dated changes at this site.
The two images we hold closest to the start and the end of those twelve months are from June 2023 and July 2025. Both were taken outside those twelve months, because we hold none closer.
What we measured in those twelve months
- July 2024The last month in which we saw heat from the furnaces.1 sign of heat in July 2024, and none in any month since.
- November 2024The site became much dimmer at night.Brightness reading fell from 24.6 in October 2024 to 5.9 in November 2024.
- Over those twelve monthsSigns of heat in each month fell from an average of 3 in January to March 2024 to 0 detections in October to December 2024, down 100%.
- Over those twelve monthsBrightness at night fell from an average of 26.5 in January to March 2024 to 15.9 brightness reading in October to December 2024, down 40%.
- Over those twelve monthsBrightness at night of the nearby town of Neath fell from an average of 8.7 in January to March 2024 to 7.1 brightness reading in October to December 2024, down 19%.
- 1.Check that the schedule of what is insured describes a works with no blast furnaces running. The risks that come with hot metal no longer apply, and the risks of an idle plant and of demolition now do.
- 2.Ask the broker for the shutdown and removal plan, and who is on site at night now that it is much dimmer.
- 3.Ask for the build programme for the replacement furnace before renewal, so that construction cover starts when the work does.
- If we see: New cleared ground or large new buildingsConstruction of the replacement furnace has started, and the policy will need a construction section.
- If we see: The first heat after more than two yearsThe new furnace is being tested, and the site is becoming an operating risk again.
- If we see: Brightness rising againMore of the site is in use at night. We would ask what has restarted.
What the company and the press have said
- March 2024: The Morfa coke ovens were reported closed. (Tata Steel UK)
- July 2024: Blast Furnace 5 was reported to have ended operations. (Tata Steel UK)
- September 2024: Blast Furnace 4 was reported to have tapped its last iron, ending steelmaking by the blast furnace route at the site. (ITV News)
- December 2024: A supply agreement was announced; the new electric arc furnace was then expected to operate by the end of 2027. (Eurometal)
Signs of heat in each month (detections)
We measured this from Jan 2023 to Oct 2026. The latest reading is 0 detections.
measuredBrightness at night (brightness reading)
We measured this from Jan 2021 to Sep 2026. The latest reading is 13.2 brightness reading.
measuredBrightness at night of the nearby town of Neath, for comparison (brightness reading)
We measured this from Jan 2021 to Sep 2026. The latest reading is 11.3 brightness reading.